Landscape Tower Linz
The park area in front of the district-workmanship is designed for the technical and aestethical requirements. The two playing areas are located between west and east, as an expansion of the old and new playing gorund.
- location
- -
- Größe
- -
- Fertigstellung
- 2017
- Auftraggeber
- -
- Leistungsphasen
- -
- Baukosten
- -
- Auszeichnung
- -
- architecture
- -